Educational [ back to projects ]
ASU Polytechnic Campus Phase 1, Mesa, Arizona:
This project was a joint venture between ASU and the City of Mesa. Project Engineer for water and sewer improvements and design of approximately 5,000 feet of 8-inch, 12-inch and 16-inch water mains and approximately 1,500 feet of 8-inch, 12-inch and 15-inch sewer line replacement. Completed the water and wastewater master plan designs for the entire campus. Master planning tasks included determining existing and future water demands, wastewater design flows, and hydraulic modeling and pipe sizing for water distribution and wastewater collection systems. The master plans also included a phased plan for converting the existing low pressure water system to a high pressure system. Designed master water meters and pressure reducing stations to tie into the existing low pressure system. Construction Value: $30,000,000.
ASU Polytechnic Campus Phase 2, Mesa, Arizona:
Phase 2 of the water and sewer replacement at the ASU/WGA Polytechnic Campus. This project is currently under design and includes design of approximately 9,000 lineal feet of 16-inch water transmission mains and 3,000 lineal feet of 15-inch and 21-inch sewer line replacement.
Skysong ASU Scottsdale Center, Scottsdale, Arizona:
Project engineer for multi use redevelopment for the partnership of ASU, the City of Scottsdale, and private developers. The development will ultimately consist of 1.2 million square feet of office research buildings, 450 residential units and a 200 room hotel. Design of 8-inch, 12-inch and 16-inch potable waterlines approximately 7,000 lineal feet in length and 5,600 lineal feet of sewer line to support the develepment. Completed the water and wastewater master plan designs for the campus. Construction Value: $20,000,000.
© 2009 Babbitt Nelson Engineering, LLC  ·  1140 East Greenway St., Suite 2, Mesa, Arizona 85203-4360, USA